DSpace logo

Please use this identifier to cite or link to this item: https://repositorio.uide.edu.ec/handle/37000/9009
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFuentes Paguay, Frank Alexander-
dc.contributor.authorLasluisas Soriano, Frank Edison-
dc.contributor.authorMagarisca Ponce, María Elizabeth-
dc.contributor.authorManzano Martínez, Paloma (tutor)-
dc.contributor.authorMolina Suarez, Enrique (tutor)-
dc.contributor.authorBenavides Gutiérrez, David Genaro (tutor)-
dc.date.accessioned2026-02-25T20:28:19Z-
dc.date.available2026-02-25T20:28:19Z-
dc.date.issued2026-
dc.identifier.citationFuentes Paguay, Frank Alexander; Lasluisas Soriano, Frank Edison; Magarisca Ponce, María Elizabeth. (2026). Diseño de un sistema de gestión de riesgos basado en la norma ISO 31000:2018 para la Dirección de Planificación y Ordenamiento Territorial del GAD Municipal de San Miguel de Bolívar. Maestría en gestión de riesgos. UIDE. Quito. 207 p.es
dc.identifier.otherUIDE-Q-TMGR-2026-51-
dc.identifier.urihttps://repositorio.uide.edu.ec/handle/37000/9009-
dc.description.abstractEl presente trabajo tuvo como finalidad diseñar un sistema de gestión de riesgos fundamentado en la norma ISO 31000:2018 para la Dirección de Planificación y Ordenamiento Territorial del GAD Municipal de San Miguel de Bolívar. La institución, encargada de administrar información estratégica para la toma de decisiones territoriales, carecía de un modelo que estructurara de forma integral la identificación, análisis y tratamiento de riesgos que puedieranafectar el cumplimiento de sus objetivos institucionales. La investigación se desarrolló mediante un diagnóstico del estado actual de la gestión de riesgos y un análisis de brechas respecto a los principios, el marco de referencia y los procesos definidos por la ISO 31000:2018....The purpose of this study was to design a risk management system based on ISO 31000:2018 for the Planning and Land Use Management Directorate of the Municipal GAD of San Miguel de Bolívar. The institution, responsible for managing strategic information for territorial decision making, lacked an integrated model to systematically structure the identification, analysis, and treatment of risks that could affect the achievement of its institutional objectives. The research was conducted through a diagnosis of the current state of risk management and a gap analysis in relation to the principles, framework, and processes established by ISO 31000:2018...es
dc.language.isoeses
dc.publisherQUITO/UIDE/2026es
dc.rightsopenAccesses
dc.subjectGESTIÓN DEL RIESGOes
dc.subjectANÁLISIS DE RIESGOes
dc.subjectMARCO DE REFERENCIAes
dc.subjectMITIGACIÓNes
dc.titleDiseño de un sistema de gestión de riesgos basado en la norma ISO 31000:2018 para la Dirección de Planificación y Ordenamiento Territorial del GAD Municipal de San Miguel de Bolívares
dc.typeThesises
Appears in Collections:Tesis - Maestría - Neuromarketing

Files in This Item:
File Description SizeFormat 
UIDE-Q-TMGR-2026-51.pdfCONFIDENCIAL173.92 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.