Please use this identifier to cite or link to this item:
https://repositorio.uide.edu.ec/handle/37000/7026
Title: | Design and Construction of a Prototype for the Painting of Honed Tube |
Authors: | Cuñas Cuñas, Tommy Jefferson Mosquera Canchingre, Guillermo Alfredo (tutor) |
Keywords: | DESIGN;CONSTRUCTION;PROTOTYPE;PAINTING OF HONED TUBE |
Issue Date: | 2024 |
Publisher: | QUITO/UIDE/2024 |
Citation: | Cuñas Cuñas, Tommy Jefferson. (2024). Design and Construction of a Prototype for the Painting of Honed Tube. Facultad de Mecatrónica. UIDE. Quito. 48 p. |
Abstract: | The prototype consists of a vertical system that allows us to move the gun vertically up to 50 cm. This process involves activating and deactivating the paint solenoid valves. It also includes a system that allows me to rotate the tube to be painted on the same axis, divided into 4 zones where the paint adheres. |
URI: | https://repositorio.uide.edu.ec/handle/37000/7026 |
Appears in Collections: | Tesis - Ingeniería en Mecatrónica |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
TESIS_MECATRONICA_CUÑAS_TOMMY.pdf | CONFIDENCIAL | 88.51 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.