DSpace logo

Por favor, use este identificador para citar o enlazar este ítem: https://repositorio.uide.edu.ec/handle/37000/7251
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorJara Morillo, Rina Gisela-
dc.contributor.authorMedina Espinosa, Tanya Solange-
dc.contributor.authorPorras Cabezas, Lorena Elizabeth-
dc.contributor.authorRamírez Rivera, Karina Esther-
dc.contributor.authorVélez Sicha, Alexis Roberto-
dc.contributor.authorMercader Castillo, José Luis (tutor)-
dc.contributor.authorCalderón, Carlos Luis (tutor)-
dc.date.accessioned2024-07-30T16:23:06Z-
dc.date.available2024-07-30T16:23:06Z-
dc.date.issued2024-
dc.identifier.citationJara Morillo, Rina Gisela; Medina Espinosa, Tanya Solange; Porras Cabezas, Lorena Elizabeth; Ramírez Rivera, Karina Esther; Vélez Sicha, Alexis Roberto. (2024). Modelo de gestión para el proceso de administración y control de bienes en la EP Petroecuador. Maestría en Gestión de Proyectos. UIDE. Quito. 98 p.es
dc.identifier.otherUIDE-Q-TMGP-2023-26-
dc.identifier.urihttps://repositorio.uide.edu.ec/handle/37000/7251-
dc.description.abstractEn este trabajo se propone un nuevo Modelo de Gestión de Bienes de EP Petroecuador. Se inicia con un análisis de la situación actual del proceso de gestión de bienes; a través del Análisis de Valor Agregado se identificaron las actividades con mayor carga horaria y costos en todas las etapas del proceso. Posteriormente, se plantearon acciones que permitan optimizar el proceso, incluyendo la incorporación de tecnologías de rastreo y adoptación del enfoque ágil en la Constatación Física. Se continuó con la estimación del impacto en carga horaria y costos al aplicar el modelo propuesto. Finalmente, se presenta las conclusiones y recomendaciones. In this document, a new Asset Management Model for EP Petroecuador is proposed. It begins with an analysis of the current situation of the asset management process; through the Added Value Analysis, the activities with the highest workload and costs in all stages of the process were identified. Subsequently, actions were proposed to optimize the process, including the incorporation of tracking technologies and adoption of the agile approach in Physical Verification. The estimation of the impact on workload and costs when applying the proposed model continued. Finally, the conclusions and recommendations are presented.es
dc.language.isoeses
dc.publisherQUITO/UIDE/2024es
dc.rightsopenAccesses
dc.subjectADMINISTRACIÓNes
dc.subjectCONTROL DE BIENESes
dc.subjectPETROECUADORes
dc.subjectVALOR AGREGADOes
dc.titleModelo de gestión para el proceso de administración y control de bienes en la EP Petroecuadores
dc.typeThesises
Aparece en las colecciones: Tesis - Maestría-Gestión de Proyectos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UIDE-Q-TMGP-2023-26.pdfCONFIDENCIAL3.26 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.