DSpace logo

Please use this identifier to cite or link to this item: https://repositorio.uide.edu.ec/handle/37000/7257
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGómez Obando, Christopher Isaac-
dc.contributor.authorAragón Cuichan, Darío Xavier-
dc.contributor.authorTrávez Cruz, Diego Andrés-
dc.contributor.authorGranda Ontaneda, Erik Fernando-
dc.contributor.authorViteri Silva, Stalin Daniel-
dc.contributor.authorMercader, José Luis (tutor)-
dc.contributor.authorCalderón, Carlos Luis (tutor)-
dc.date.accessioned2024-07-30T18:59:59Z-
dc.date.available2024-07-30T18:59:59Z-
dc.date.issued2024-
dc.identifier.citationGómez Obando, Christopher Isaac; Aragón Cuichan, Darío Xavier; Trávez Cruz, Diego Andrés; Granda Ontaneda, Erik Fernando; Viteri Silva, Stalin Daniel. (2024). Incremento de la capacidad de producción de Clinker en la línea 2 de 1650 a 1900 toneladas de producción diaria para la planta de Otavalo de la empresa UNACEM en el Año 2024. Maestría en Gestión de Proyectos. UIDE. Quito. 108 p.es
dc.identifier.otherUIDE-Q-TMGP-2023-32-
dc.identifier.urihttps://repositorio.uide.edu.ec/handle/37000/7257-
dc.description.abstractUNACEM-Ecuador enfrenta un desafío en la planta de Otavalo, donde la línea de producción número 2, con una capacidad de 1650 toneladas por día, es insuficiente para satisfacer la demanda del mercado. Este proyecto busca aumentar la capacidad de producción a 1900 toneladas por día, mejorando la eficiencia y sostenibilidad mediante la modernización y repotenciación de componentes críticos como son: el precalentador de ciclones, el horno rotativo y el enfriador de clinker. Estas mejoras tecnológicas no solo incrementarán la producción en un 15,15%, sino que también optimizarán el consumo energético. La justificación de esta iniciativa se basa en la necesidad de asegurar una disponibilidad adecuada del producto a nivel nacional y mantener el liderazgo de UNACEM en la industria cementera en el país. UNACEM se destaca por su compromiso con la calidad, la sostenibilidad y la innovación, elementos clave para cumplir con su misión y visión corporativa. UNACEM-Ecuador faces a challenge at the Otavalo plant, where Production Line 2, with a capacity of 1650 tons per day, is insufficient to meet market demand. This project aims to increase production capacity to 1900 1650 tons per day by enhancing efficiency and sustainability through the modernization and upgrading of critical components such as the cyclone preheater, rotary kiln, and clinker cooler. These technological improvements will not only increase production by 15.15% but also optimize energy consumption. The justification for this initiative is based on the need to ensure adequate product availability nationwide and maintain UNACEM's leadership in the cement industry in the country. UNACEM is distinguished by its commitment to quality, sustainability, and innovation, which are key elements in fulfilling its corporate mission and visión.es
dc.language.isoeses
dc.publisherQUITO/UIDE/2024es
dc.rightsopenAccesses
dc.subjectCAPACIDAD DE PRODUCCIÓNes
dc.subjectMERCADOes
dc.subjectCEMENTOes
dc.subjectTECNOLOGÍAes
dc.titleIncremento de la capacidad de producción de Clinker en la línea 2 de 1650 a 1900 toneladas de producción diaria para la planta de Otavalo de la empresa UNACEM en el Año 2024.es
dc.typeThesises
Appears in Collections:Tesis - Maestría-Gestión de Proyectos

Files in This Item:
File Description SizeFormat 
UIDE-Q-TMGP-2023-32.pdfTESIS A TEXTO COMPLETO6.62 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.