DSpace logo

Please use this identifier to cite or link to this item: https://repositorio.uide.edu.ec/handle/37000/6508
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAlvarado Guzñay, Joselyne Adriana-
dc.contributor.authorBautista Zumba, Franklin Arturo-
dc.contributor.authorManosalvas Paredes, Leonardo David-
dc.contributor.authorSantamaría Jerez, Karina Lorena-
dc.contributor.authorPérez Seminario, Héctor Junior-
dc.contributor.authorMolina Suárez, Enrique (tutor)-
dc.contributor.authorManzano Martínez, Paloma (tutor)-
dc.date.accessioned2023-12-01T20:47:16Z-
dc.date.available2023-12-01T20:47:16Z-
dc.date.issued2023-
dc.identifier.citationAlvarado Guzñay, Joselyne Adriana; Bautista Zumba, Franklin Arturo; Manosalvas Paredes, Leonardo David; Santamaría Jerez, Karina Lorena; Pérez Seminario, Héctor Junior. (2023). Diseño del plan integral de gestión de riesgos aplicando las normas ISO 31000:2018 en la quebrada Yacupugro en el sector de Cochapamba, para mitigar los riesgos de movimiento de masa. Maestría en Gestión de Riesgos. UIDE. Quito. 215 p.es
dc.identifier.otherUIDE-Q-TMGR-2023-20-
dc.identifier.urihttps://repositorio.uide.edu.ec/handle/37000/6508-
dc.description.abstractEste trabajo de titulación consiste en el diseño del plan integral de gestión de riesgos aplicando las normas ISO 31000:2018 en la quebrada Yacupugro en el sector de Cochapamba, para mitigar los riesgos de movimiento de masa. En los últimos años, en las Laderas del volcán del Pichincha de la ciudad de Quito se han presentado varios movimientos de masa ocasionando gran preocupación en la población, es por ello que La Secretaría Nacional de Gestión de Riesgos y la Empresa Pública Metropolitana de Agua Potable y Saneamiento (EPMAPS) colaboran en la creación de un plan integral de reducción del riesgo de desastres por deslizamientos, terremotos y temporada invernal para varios barrios capitalinos en riesgo. Esto permite anticiparse al riesgo y asegurar los objetivos y metas estratégicas definidas por la EPMAPS, asimismo tener un panorama global de las amenazas que afectarían o impactarían a la empresa. Esto se conseguirá aumentando la gestión de riesgos en la unidad de mantenimiento de la cuenca hidrográfica e implantando la norma ISO 31000:2018. This degree work consists of the design of a comprehensive risk management plan applying ISO 31000:2018 standards in the Yacupugro stream in the Cochapamba sector, to mitigate the risks of mass movement. In recent years, on the slopes of the Pichincha volcano in the city of Quito there have been several mass movements causing great concern among the population, which is why the National Secretariat of Risk Management and the Metropolitan Public Company of Drinking Water and Sanitation (EPMAPS) collaborate in the creation of a comprehensive disaster risk reduction plan for landslides, earthquakes and winter season for several capital neighborhoods at risk. This allows anticipating risk and ensuring the strategic objectives and goals defined by EPMAPS, as well as having a global overview of the threats that would affect or impact the company. This will be achieved by increasing risk management in the watershed maintenance unit and implementing ISO 31000:2018.es
dc.language.isoeses
dc.publisherQUITO/UIDE/2023es
dc.rightsopenAccesses
dc.subjectQUEBRADAes
dc.subjectGESTIÓN DE RIESGOSes
dc.subjectMOVIMIENTO DE MASASes
dc.subjectMITIGACIÓNes
dc.titleDiseño del plan integral de gestión de riesgos aplicando las normas ISO 31000:2018 en la quebrada Yacupugro en el sector de Cochapamba, para mitigar los riesgos de movimiento de masaes
dc.typeThesises
Appears in Collections:Tesis-Maestría-Gestión de Riesgos y Emergencias

Files in This Item:
File Description SizeFormat 
UIDE-Q-TMGR-2023-20.pdfCONFIDENCIAL116.97 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.